professional medical

product

High-Quality Urine Bag Mold

Specifications:

Specifications

1. Mould base: P20H LKM
2. Cavity Material: S136 , NAK80 ,SKD61 etc
3. Core Material: S136 , NAK80, SKD61 etc
4. Runner: Cold or Hot
5. Mould Life: ≧3millons or ≧1 millons moulds
6. Products Material: PVC, PP, PE, ABS, PC, PA, POM etc.
7. Design Software: UG. PROE
8. Over 20years Professional Experiences in Medical Fields.
9. High Quality
10. Short Cycle
11. Competitive Cost
12. Good After-sales service


Product Detail

Product Tags

Product Show

Product Introduction

If you are referring to the presence of mold on a urine bag, it is important to address this issue promptly. Mold can pose health risks if inhaled or come into contact with the body. Here are some steps to take:Dispose of the molded urine bag: Safely remove and dispose of the contaminated urine bag. Do not attempt to clean or reuse it to prevent further contamination.Clean the area: Thoroughly clean the area where the moldy urine bag was stored or placed. Use a mild detergent and water solution or a disinfectant recommended for mold cleanup.Inspect other supplies: Check any other supplies, such as tubing or connectors, that may have been in contact with the moldy urine bag. Dispose of any contaminated items and clean the remaining ones properly.Prevent future mold growth: Mold typically thrives in damp, dark environments. Ensure that your storage area is well-ventilated, dry, and clean to prevent mold growth. Regularly inspect and clean your medical supplies to avoid potential contamination.Seek medical advice: If you or someone else has come into contact with a moldy urine bag and is experiencing any adverse health effects, such as respiratory symptoms or skin irritation, it is recommended to seek medical advice.Remember, it is essential to follow proper hygiene practices and maintain a clean environment when dealing with medical supplies to ensure the safety and well-being of individuals using them.

Mould  Process

1.R&D We receive  customer 3D   drawing or sample with details requirements 
2.Negotiation Confirm   with clients details about: the cavity, runner, quality, price,   material, delivery time, payment item, etc. 
3.Place an order  According your clients design   or chooses our suggestion design. 
4. Mould First   We send mould design to customer approval before We make the mould and then start   production. 
5. Sample  If   the first sample come out is not satisfied customer, we modify the mould and   until meet customers satisfactory. 
6. Delivery time 35~45days

Equipment List

Machine  Name   Quantity ( pcs ) The original country
CNC      5 Japan/Taiwan
EDM      6 Japan/China
EDM ( Mirror)      2 Japan
Wire Cutting  ( fast )      8 China
Wire Cutting  ( Middle )      1 China
Wire  Cutting  ( slow )      3 Japan
Grinding        5 China
Drilling        10 China
Lather     3 China
Milling       2 China

  • Previous:
  • Next: